Payment chain
In the construction industry, payment can be the source of a great deal of controversy. Not only are the sums involved very large, and the duration of projects very long, but the total amount payable tends to change over time. In addition, contractors, subcontractors and suppliers face considerable risk when pricing construction projects, and optimistic pricing or late payments can quickly cause cash flow problems.
As a result, payments are often the source of disputes which can ultimately lead to a breakdown in relationships and even project or business failure.
The supply chain is the interconnected hierarchy of supply contracts necessary to procure a built asset. On large or complex projects, responsibility and performance generally cascades down the supply chain to a plethora of suppliers sometimes unknown to management at the top of the chain.
The payment chain refers to the accounting practices adopted during these long-term and sometimes difficult construction projects to allow payments to filter down through the chain of contracts.
This extended chain can cause cash flow problems as one supplier may struggle to pay the next supplier in the chain until they themselves have been paid. In the past this resulted in 'pay when paid' provisions, that meant those at the bottom of the chain could wait many months before being paid for works they had undertaken.
However, the Housing Grants, Construction and Regeneration Act 1996 included provisions to ensure that payments are made regularly and promptly throughout the supply chain. This includes disallowing pay when paid clauses.
In addition, 'pay when certified' clauses are no longer allowed, and the release of retention cannot be prevented by conditions within another contract. So for example work contractors on a management contract project must have half of their retention released when their part of the works reach practical completion, not when the project as a whole reaches practical completion.
Suppliers have the right to suspend work for non-payment or to suspend part of the works and to claim costs and expenses incurred and extension of time resulting from the suspension.
See also: Down payment chain.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.